top of page

SARK ENGINEERS & CONSULTANTS
Knowledge Shared is knowledge multiplied...


Data Required for ETP Design: Flow, BOD, COD, TSS, TDS, Sludge and Reuse
Before designing or buying an Effluent Treatment Plant, industries must collect the right wastewater data. This blog explains the key ETP design inputs — flow, BOD, COD, TSS, TDS, pH, sludge, reuse target, ZLD requirement and source-wise effluent details — so the treatment system is sized correctly and avoids future compliance failures.

Dr. Anubhav Gupta
Jul 90 min read


The Significance of BOD, COD, TDS, and TSS in Wastewater Treatment: Deeper Dive into Ratios and Their Significance
BOD, COD, TDS and TSS are key wastewater treatment parameters used to judge organic load, dissolved solids, suspended solids, treatment efficiency and compliance risk. This guide explains what each parameter means, how ratios such as BOD/COD and TSS/COD are interpreted, and when industries should review ETP/STP performance, process control, water reuse or treatment plant design.

Dr. Anubhav Gupta
Sep 10, 20247 min read
bottom of page