top of page

SARK ENGINEERS & CONSULTANTS
Knowledge Shared is knowledge multiplied...


Can Industrial Expansion Be Approved When Groundwater Availability Is Limited?
Industrial expansion does not always require a proportional increase in groundwater abstraction. Where groundwater availability is restricted, the project may still be feasible if additional production demand is met through water-efficiency measures, condensate recovery, ETP/STP reuse, cooling optimisation and alternative authorised water sources. This guide explains how industries should assess expansion feasibility before filing approvals or committing CAPEX.

Dr. Anubhav Gupta
Sep 410 min read
Â
Â
Â


Buying Industrial Land? Check These Groundwater Risks Before Purchase
A plot may have excellent road access, power and land price—and still be a poor industrial site if its water strategy is unworkable. Before purchasing industrial land, investors should check the exact groundwater assessment unit, regulatory authority, borewell feasibility, permitted abstraction, water quality, alternative supplies, reuse potential and future expansion demand. This guide explains a practical groundwater due-diligence framework for industrial land selection.

Dr. Anubhav Gupta
Aug 3111 min read
Â
Â
Â


Can Industries Extract Groundwater in an Over-Exploited Area?
Can a factory extract groundwater in an Over-Exploited area? The answer depends on whether the industry is new or existing, whether it qualifies as an MSME, whether additional abstraction is proposed, and which groundwater authority applies. This guide explains the current CGWA framework and how industries should redesign their water strategy where groundwater is constrained.

Dr. Anubhav Gupta
Aug 2511 min read
Â
Â
Â


Safe, Semi-Critical, Critical and Over-Exploited Groundwater Areas: What Do They Mean?
What does it mean when an industrial location is classified as Safe, Semi-Critical, Critical or Over-Exploited for groundwater? This guide explains how CGWB groundwater categories are determined, what the percentages mean, and why industries should treat groundwater classification as an important project-planning signal rather than simply a yes-or-no test for borewell permission.

Dr. Anubhav Gupta
Aug 1611 min read
Â
Â
Â


CGWA Approval for Borewells: Groundwater Extraction NOC Explained
This guide explains the CGWA borewell NOC process for industries, infrastructure projects, commercial buildings and residential societies, including Bhu-Neer application steps, documents, hydrogeological reports, telemetry, water audits, recharge planning and state groundwater authority compliance.

Dr. Anubhav Gupta
Apr 27 min read
Â